Maliana 1 Irrigation System East Timor

Description

The structures in the Maliana 1 Headworks project for Rehabilitation and Improvement included:

  1. A fixed weir
  2. Crossing type concrete block
  3. Scouring sluice gate structure
  4. Right bank protection wall
  5. left bank protection wall
  6. Intake gate structure
  7. Connection canal
  8. Sediment settling basin
  9. Scouring gate intake structure
  10. Canal intake gate structure
  11. Storage for O & M Equipment Building
  12. Gate Keeper's House
Features:
Project Type:
  • Structures