Earth Works


Specialist Training Wing Metinaro East Timor

East Timor

The Specialist Training Wing comprising the primary multi-user facility with three separate specialist areas which includes:

1. STW primary multi-user facility comprising of common/shared training areas

2 Medical Training Facility

3. Engineering Close Training Area (CTA)

4. Communications Training Facility

 

This page requires Adobe Flash Player version 8 or above.

 

East Timor Defence Force Training

East Timor

With the largest design capcity in East Timor, RMS was the logical choice for the design and construction of this important part of the East Timorese Defence infrastructure. Design and construction was fast-tracked to achieve the very tight timeframe required.

 

This page requires Adobe Flash Player version 8 or above.

 

Tibar Ermera Road

East Timor

Emergency infrastructure maintenance project. Over 200 local personnel gained valuable experience in the construction of protection works. RMS used this project to train local supervisors in modern construction techniques.

 

This page requires Adobe Flash Player version 8 or above.

 

Australian Embassy Compound

East Timor

Construction of compound and accommodation facilities Dili. this construction showcased the various skills of the RMS workforce. The project included detailed excavation, building construction and concrete works, construction of a water treatment plant and swimming pool. An Earth Award was received for this project.

 

This page requires Adobe Flash Player version 8 or above.

 

DCP Residential Compound Phase 2 East Timor

East Timor

This East Timor project  included site preparation earthworks, landscaping, roadworks and building works. DCP Residential Compound is a fully self-sustaining secure compound consisting of four x 4 bedroom homes, swimming pool, guard house, gymnasium, water purification, waste water treatment plant and electrical generation plant, built during Phase 1.

 

This page requires Adobe Flash Player version 8 or above.

 

Heliport Facilities Relocation Dili East Timor

East Timor

Site preparation and earthworks, concrete paving works, road works and building works. The facilities requiring relocation of ADF infrastructure facilities within the Dili Heliport Site through Patrick Defence Logistics commissioned RMS to look after the relocation of all the Heliport Facilities.

 

This page requires Adobe Flash Player version 8 or above.

 

DCP Residential Compound Phase 1 East Timor

East Timor

Earthworks and infrastructure, security wall, houses, building works, road works and landscaping. The construction of DCP Residential Compound Phase 1 was designed for a fully sulf-sustaining compound separated into three package types:

  1. Earthworks and infrastructure
  2. Security wall package
  3. Construction of Housing package
 

This page requires Adobe Flash Player version 8 or above.

 