Berrimah Corrections Centre Prisoner AccommodationQueensland Design, Document, Construct and install Prisoner Accommodation at the Berrimah CorrectIon Centre Tivendale Road Berrimah NT. The project involved design, documentation and off-site construction and installation of two different styles of Prisoner Accommodation and an Officers Station. the project realized an increase of 80 beds. |
This page requires Adobe Flash Player version 8 or above. |
|
Specialist Training Wing Metinaro East TimorEast Timor The Specialist Training Wing comprising the primary multi-user facility with three separate specialist areas which includes: 1. STW primary multi-user facility comprising of common/shared training areas 2 Medical Training Facility 3. Engineering Close Training Area (CTA) 4. Communications Training Facility |
This page requires Adobe Flash Player version 8 or above. |
|
Parliament House Central Dili East TimorEast Timor Construction and installation of 275 units of pre-cast concrete barriers for East Timor's Parliament House. |
This page requires Adobe Flash Player version 8 or above. |
|
US Embassy Building Phase 2 East TimorEast Timor Building construction and minor site development. Construction of three buildings for the new United States of America Embassy. |
This page requires Adobe Flash Player version 8 or above. |
|
New Zealand Consulate Office East TimorEast Timor Construction of perimeter walls utilizing monolithic reinforced concrete for the New Zealand Compound. |
This page requires Adobe Flash Player version 8 or above. |
|
Training Facility Metinaro East TimorEast Timor This facility is a dedicated facility designed and constructed for the provision of English language training part of the Training Program for FDTL Military. The building was constructed using the lowest hot dipped galvanized steel framed structures built onto a concrete slab and footings.
|
This page requires Adobe Flash Player version 8 or above. |
|
US Embassy East Timor Phase 1East Timor Construction of new concrete barrier wall at the US Embassy Pantai Kelapa Dili. Production and installation of a solid anti-ram concrete fence throughout the perimeter of the new US Embassy Office in East Timor. |
This page requires Adobe Flash Player version 8 or above. |
|
Laclo Irrigation East TimorEast Timor This project was intended to rehabilitate the existing 1.63km of irrigation system to supply the Manatuto District farmland. The project was completed within 14 weeks (6 weeks ahead of schedule) including additional variation orders. Manpower on site was predominantly made up of Timorese workers, skilled and unskilled. |
This page requires Adobe Flash Player version 8 or above. |
|
Manatuto Irrigation Phase 1East Timor Autonomous supply of construction materials gave RMS the capacity to complete this project ahead of schedule and at a lower cost. RMS established a batch plant onsite as well as producing the gabion rock required for environmental protection works. |
This page requires Adobe Flash Player version 8 or above. |
|
East Timor Defence Force TrainingEast Timor With the largest design capcity in East Timor, RMS was the logical choice for the design and construction of this important part of the East Timorese Defence infrastructure. Design and construction was fast-tracked to achieve the very tight timeframe required. |
This page requires Adobe Flash Player version 8 or above. |
|
Australian Embassy CompoundEast Timor Construction of compound and accommodation facilities Dili. this construction showcased the various skills of the RMS workforce. The project included detailed excavation, building construction and concrete works, construction of a water treatment plant and swimming pool. An Earth Award was received for this project. |
This page requires Adobe Flash Player version 8 or above. |
|
Suai WarehouseEast Timor Construction of a warehouse and associated civil works in Suai East Timor. This was a self contained warehouse constructed with power generation, desalination plant and water infrastructure included in the final design. Construction was undertaken whilst hostilities were still underway. RMS relied on the protection of the ADF. |
This page requires Adobe Flash Player version 8 or above. |
|
Dili Wharf Container HardstandEast Timor Construction of a hardstand at Dili Wharf. The construction of works is enhanced by the ability to supply and deliver quarrry products and concrete as part of an integrated approach to project delivery. |
This page requires Adobe Flash Player version 8 or above. |
|
Maliana 1 Irrigation System East TimorEast Timor The structures in the Maliana 1 Headworks project for Rehabilitation and Improvement included:
|
This page requires Adobe Flash Player version 8 or above. |
|
DCP Residential Compound Phase 2 East TimorEast Timor This East Timor project included site preparation earthworks, landscaping, roadworks and building works. DCP Residential Compound is a fully self-sustaining secure compound consisting of four x 4 bedroom homes, swimming pool, guard house, gymnasium, water purification, waste water treatment plant and electrical generation plant, built during Phase 1. |
This page requires Adobe Flash Player version 8 or above. |
|
Heliport Facilities Relocation Dili East TimorEast Timor Site preparation and earthworks, concrete paving works, road works and building works. The facilities requiring relocation of ADF infrastructure facilities within the Dili Heliport Site through Patrick Defence Logistics commissioned RMS to look after the relocation of all the Heliport Facilities. |
This page requires Adobe Flash Player version 8 or above. |
|
DCP Residential Compound Phase 1 East TimorEast Timor Earthworks and infrastructure, security wall, houses, building works, road works and landscaping. The construction of DCP Residential Compound Phase 1 was designed for a fully sulf-sustaining compound separated into three package types:
|
This page requires Adobe Flash Player version 8 or above. |
|
Memorial Building Korean Embassy East TimorEast Timor Construction of the Memorial Building for the Korian Embassy Dili East Timor. Supply of ready mixed concrete on the projects strujctural and architectural concreting. |
This page requires Adobe Flash Player version 8 or above. |
|